Custom Solutions for Runway Rehab: Innovative Equipment & Tracking Applications

Chris Weir

Chris Weir

In Los Angeles, CA, Aldridge crews utilized subject matter experts and an in-house development team to provide a transformative innovative solution to a runway rehabilitation project. 

The Runway 7R/25L rehabilitation project at Los Angeles' LAX airport was a fast-paced runway rehabilitation of one of the most heavily used runways in the United States. The rehabilitation took place during a 60-day closure of the runway. The overall scope of the project was removal and replacement of pavement and electrical infrastructure on 6000LF of the runway. This required complete removal and replacement of the in-pavement light bases within the paving area as well as installation of 700+ new light fixtures and 80,000LF of 5kV Cable.

 

 

As part of this pavement removal and replacement, Aldridge removed and replaced 300+ in-pavement light bases which required coring and removing a 3 ft Diameter x 3 ft Deep at each location. Known for innovative solutions in project execution, Aldridge’s innovation team custom-built a coring machine to install the new lights. This core barrel machine was specifically designed for work done at airports and has the ability to core up to a 48" diameter at a speed three times as fast as the traditional machines that are widely used throughout the industry.

“The Runway 7R/25L rehabilitation project at Los Angeles' LAX airport was a fast-paced runway rehabilitation of one of the most heavily used runways in the United States.”

Due to the project schedule constraints, Aldridge was required to complete the removal and replacement of the 300 base cans in just under two weeks, requiring crews to work around the clock for the first two weeks of the runway closure. The tight initial schedule for Aldridge to remove and replace the base cans required much more labor and project management oversight than a typical project running one shift. Management resources and subject matter experts from all over the company were brought in to work hand-in-hand with our West Coast teams to provide this extra support and oversight during the round-the-clock operation. 

 