Current Trends in the AEC Industry, Embracing BIM (Building Information Modeling)


A nationally recognized leader in federal architecture, J.J. Tang has led the design of many federal facilities that are critical to our country’s defense and to US security around the world in the past two decades. As a business executive, J.J. has successfully led and pursued key program initiatives in the past 10 years, and have propelled his organization to the forefront of the industry.
Over the years, how has the AEC industry evolved? What has become a pain point in the building design?
About sustainable design: A couple of decades back, sustainable design was a buzz word in the AEC industry. The industry was looking for a leader to champion the sustainable design movement. The LEED (Leadership in Energy and Environmental Design) rating system had just emerged. DoD (Department of Defence) was one of the first champions of sustainable design movement in requiring LEED silver rating facility design for all DoD buildings above a certain size. Since the federal government was the largest buyer of architectural and engineering services, this move received a lot of attention and started to put sustainable design on the map in the AEC industry. Now sustainable design is the norm, thanks to the federal government’s effort in championing this.
About design/build: Design/build as a delivery method had been around for a while before the BRAC (Base Realignment and Closure) era in the 2000s. However, it did not really get much attraction until DoD started using design/ build as its primary procurement method of executing hundreds of billions of military construction projects. This move, once again got a lot of attention and started to put design/build on the map in the AEC industry.
Under the design/build delivery method, the government typically shortlists three to five design/builders based on qualifications and asks them to quote a firm price before selecting a winner for the project. The design/builder cannot quote a firm price until their designer completes about 15% of the design. Per The Brooks Act, architects and engineers working for the federal government are required to be compensated for their professional services. However, in the design/build method, designers have contracts directly with contractors, not with the government. As a result, neither the government nor contractors have the obligation to pay for a designer’s services during the bid phase unless the design/ build wins the contract. This approach of not compensating designers upfront during the bid phase has put a lot of stress on AE businesses. Because at least two out of three designs in every design/build procurement are not used, it also wastes AE resources. This has been a big challenge facing the AEC industry: We don’t want any party holding the short end of the stick involved in design/build procurement. Design/build has many merits in delivering a project, and we want it to flourish as a delivery method.
What young professionals need to learn is the human side of design
Owners, contractors and designers must work together to solve the challenge of requiring designers to provide up to 15% to 30% free design services during the bid phase.
About the current construction market: The current construction market is very active. Despite designers’ best efforts, industry estimates of the real construction cost usually end up 10% to 15% higher than estimated, and solving it has become a challenge. One way to address this is by encouraging designers, contractors and owners to adapt BIM software programs. A 3D BIM model of a building allows for better understanding and accuracy of design, cost estimates and construction. That’s because quantity, quality of building materials and systems with minimum conflicts are all incorporated into the BIM model.
Could you comment more on your 3D Building Information Management Initiatives?
HDR’s 3D building information management initiatives began in earnest in 1998. Before that, designers were predominantly working with 2D drawings, using AutoCAD. HDR designed pilot projects in Revit, trying to capture information and design in a true 3D model. At that point, HDR was the frontrunner to implement 3D building information management technology in the industry. Since 2015, all HDR projects have been using 3D BIM. One of the first, large scale, full-fledged BIM design projects implemented by HDR is U.S. Strategic Command headquarters building at Offutt Air Force Base, Nebraska. Construction was just completed in 2019 after 10years of design and construction, using BIM. This is also the first large-scale DoD project for the Army Corps of Engineers. Our design services are getting a very positive response from clients and having a profound impact on the industry.

Please shed more light on 3D modeling in construction and building operation & management.
When we take the BIM model to contractors and owners, most are not familiar with the 3D model and how to use information derived from it. There is a need to educate them about the advantage of linking the BIM model to cost estimates and 3D visualizations. While the downside of the BIM model is the initial time investment for model creation and framework building, 3D images have the benefit of being easier to understand, and a 3D walk-through makes it easier to assume the design, along with the model issues or problems that need to be addressed.